Futures
N = (BPV_target − BPV_portfolio) / BPV_futures, where BPV = modified duration × value × 0.0001 and futures BPV ≈ BPV of the cheapest-to-deliver / conversion factor.
Swaps
| Position | Effect on duration | Like |
|---|---|---|
| Receive fixed, pay floating | Adds | Long a fixed bond, short a floater |
| Pay fixed, receive floating | Reduces | Short a fixed bond, long a floater |
Swap duration (receiver) ≈ D_fixed − D_float. Notional needed = (BPV target − BPV portfolio) / BPV per $ of swap notional.
Hedging a future borrowing
| Tool | Gains when rates rise? |
|---|---|
| Payer swaption | Yes, with limited cost (premium) |
| Short interest rate futures / FRA (pay fixed) | Yes, but locks in the rate both ways |
| Interest rate cap | Yes, for floating-rate borrowing |
Essay practice
Case. A $200m bond portfolio has modified duration 6.5. The manager expects falling rates and wants duration 8.0. A 5-year receiver swap has a duration of about 4.2 per unit of notional.
Task. Calculate the swap notional needed.
Model answer
Additional BPV needed = (8.0 − 6.5) × 200m × 0.0001 = $30,000. Swap BPV per $ of notional = 4.2 × 0.0001. Notional = 30,000 / 0.00042 ≈ $71.4m receiver swap.
Exam focus
Calculate futures and swap quantities to reach a target duration, and pick the right instrument for a hedging goal.